If the civil structure is the skeleton of the Data Center, the MEP phase represents its vital system. In this phase technical complexity grows exponentially, bringing to the surface the most insidious danger: electrical risk.
Active Risk
A "live" construction site tolerates no errors. When electricity enters the Data Center, every procedure changes. We manage this critical transition by transforming invisible risk into a visible and controlled process.
The Three Pillars
We manage the transition from installation to energisation with rigorous isolation protocols.
Physical locking systems for energy sources. Certainty that energy is isolated before every intervention.
Physical isolation between active zones and areas under construction. We coordinate the coexistence between mechanical assembly and electrical testing.
Culture of Awareness
Electricity cannot be seen or felt until it is too late. For this reason, in addition to physical systems, we work on workers' risk perception: